Excellent renovation and maintenance services! The team is highly professional, reliable and committed to delivering quality work. Their attention to detail and customer service are truly impressive. Highly recommended for anyone looking for top-quality renovation and maintenance services.
Bathroom renovation in Dubai
A bathroom that looks good and stays dry. We strip out, waterproof and flood test, then tile, fit and finish, so the new bathroom does not leak into the room below.
- Free site visit and itemised quote
- Apartments, villas and offices across Dubai
- Approvals and NOCs prepared for you
- Rated on Google Google reviews
- All Dubai communities
Plan your bathroom
Book a free site visit. We measure, check what your building allows and send an itemised quote.
Prefer to chat? Send the details on WhatsApp
- Price agreed before workNo surprises on the invoice
- Every trade, one teamAC, MEP, joinery, finishing
- Workmanship guaranteeWe come back if our work fails
- Quick WhatsApp repliesSend a photo, get a clear answer
Why people redo their bathroom
Most of our renovation clients come to us for one of these reasons.
Leaks to the floor below
Water marks downstairs or in the apartment below.Mould and smells
Black grout, musty smells and damp walls.Bathtub you never use
Replacing it with a walk-in shower.Dated tiles and fittings
A bathroom that looks its age.No storage
Nowhere to put anything, cluttered surfaces.Upgrade before renting
A modern bathroom that tenants notice.
What is under the tiles matters most
Most bathroom problems in Dubai come from what you cannot see: membranes that were never tested, drains without a proper fall, and silicone doing the job waterproofing should. A beautiful bathroom on top of that will start to leak within a year or two.
We strip back to the structure, renew plumbing where needed, waterproof and flood test, set the falls to the drain and only then tile. Walk-in showers, wall-hung toilets, concealed cisterns and vanity storage are all part of what we install.
What a bathroom renovation includes
Strip-out and preparation
Old tiles, fittings and screed removed back to the structure.Waterproofing and flood test
Membrane applied and tested for 24 to 48 hours.Plumbing
New supply and drainage, concealed cisterns and mixers.Tiling
Floor and wall tiles with correct falls and neat cuts.Sanitaryware and showers
Wall-hung toilets, vanities, walk-in showers and screens.Lighting and ventilation
Moisture-rated lighting, mirrors and extract fans.

Before and after
Drag the handle to compare. Every project is photographed at the start and at handover, so you can see exactly what changed.
- Itemised scope agreed before work starts
- One site lead and WhatsApp updates with photos
- Snag list closed before handover
What you get with every renovation quote
We price every renovation after a site visit, line by line. These come as standard.
- Site visit and bathroom planLayout options and itemised quote.Free
- Bathroom waterproofing onlyIf you only need the membrane redone and tested.From AED 1,200
- Full bathroom renovationStrip-out, waterproofing, tiling and new fittings.Quote
- Workmanship guaranteeIncluding the waterproofing we install.Included
Bathroom prices depend on size, tiles and fittings chosen. We give you options to suit your budget.
How it works
- 1
Site visit and measure
We visit, measure, check what the building and community allow, and listen to how you want to use the space.
- 2
Written, itemised quote
You receive a scope of work with materials, quantities and a programme. No vague lump sums.
- 3
Approvals and materials
Where permits or a developer NOC are needed we prepare the paperwork and order long-lead materials early.
- 4
Build in the right order
Demolition, MEP first fix, waterproofing, tiling, joinery, final fix. One site lead keeps you updated on WhatsApp.
- 5
Snag list and handover
We walk the finished space with you, close every snag item and hand over with a workmanship guarantee.
Watch: a bathroom renovation done properlyShawakesh Technical ServicesWhy Dubai homeowners choose Shawakesh
Itemised quotes
Every line priced, so you can compare and decide where to spend.Approvals handled
Building, developer and authority paperwork prepared for you where the scope requires it.One accountable team
Civil, MEP, joinery and finishing under one site lead, one contract, one number to call.Proper handover
A snag walk-through, a cleaned site and a workmanship guarantee at the end.What customers say about our work
Rated on Google, reviews
Highly recommend Shawakesh Technical Services! They replaced my water heater tank at Autograph, JVC, at a very reasonable price. The quality of work and finishing were excellent and they completed the job efficiently and on time.
Reliable and professional service from Shawakesh Technical Services LLC. The service was done properly and on time, at a fair price. Recommended.
Bathroom renovation: common questions
Can’t see your question? Ask us on WhatsApp and you will get a straight answer.
How long does a bathroom renovation take?
Usually two to three weeks for a standard bathroom, including waterproofing, the flood test and tile curing time.
Can you replace a bathtub with a walk-in shower?
Yes, in most bathrooms. We check the drain position and floor build-up to create a proper fall, and can install a level-access shower where the structure allows.
Do you flood test the waterproofing?
Always. The area is filled with water for 24 to 48 hours before tiling to confirm there are no leaks.
Do I need approval for a bathroom renovation?
Most buildings and communities require approval, especially when plumbing is changed. We check and handle the paperwork.
Can you supply the tiles and sanitaryware?
Yes, or you can choose your own. We help with quantities and make sure your choices suit the layout and plumbing.
Can I use another bathroom during the work?
If you have one, yes. We keep the work area sealed to limit dust in the rest of the home.
Related services
Waterproofing
Bathroom, balcony, roof and water tank waterproofing, tested before anything is covered.Bathrooms from AED 1,200View serviceTiling and Flooring
Cracked tile replacement, regrouting, new floor and wall tiling, marble and parquet repairs.From AED 45 per sq mView servicePlumbing Services
Leaks, blocked drains, low pressure, water heaters, mixers and pumps fixed properly.Visit from AED 149View servicePlan your new bathroom
Send a photo or a short video on WhatsApp and we will tell you what it needs and what it will cost. Prefer to talk? Call us and a coordinator will pick up.
- Call+971 58 174 3432
- OfficeDubai, Dubai
- Hours
Plan your project
A coordinator will call or WhatsApp you to confirm the details and book a visit.
Prefer to chat? Send the details on WhatsApp
